Land Surveying and Engineering Insights

Who Should an ALTA Survey Be Certified To?
Oct 27, 2026

Who Should an ALTA Survey Be Certified To?

Identify the insured, lender, title insurer, and any negotiated additional recipients before an ALTA survey is certified. Confirm the names with the t

Read more →
Can an ALTA Survey Start Without a Title Commitment?
Oct 26, 2026

Can an ALTA Survey Start Without a Title Commitment?

An ALTA survey request may begin before the current title commitment arrives, but the final scope depends on usable title evidence and the insurer’s r

Read more →
What to Send When Requesting an FAA 1A or 2C Tower Survey
Oct 25, 2026

What to Send When Requesting an FAA 1A or 2C Tower Survey

Requesting a tower position and elevation certification? Send the site, structure, filing requirements, design files, access details, and recipient ne

Read more →
What Survey Information Does a Seattle Steep-Slope Site Need Before Design?
Oct 24, 2026

What Survey Information Does a Seattle Steep-Slope Site Need Before Design?

For a Seattle steep-slope site, align the topo scope with the architect, civil engineer, geotechnical team, and current SDCI requirements before desig

Read more →
What to Do When Construction Plans Change After Staking
Oct 23, 2026

What to Do When Construction Plans Change After Staking

When plans change after staking, pause affected layout, identify the current drawing and control, and agree what must be checked or restaked before wo

Read more →
What Survey Base Does a Seattle Street Improvement Permit Need?
Oct 22, 2026

What Survey Base Does a Seattle Street Improvement Permit Need?

A Seattle Street Improvement Permit needs a survey and base map for the affected right of way. Define control, topography, limits, and handoff before

Read more →
What If Title Exception Documents Arrive After an ALTA Survey Is Ordered?
Oct 21, 2026

What If Title Exception Documents Arrive After an ALTA Survey Is Ordered?

Late title exceptions can change an ALTA survey’s research, fieldwork, and delivery scope. Here is what the transaction team should send and confirm.

Read more →
Why Two Topographic Survey Proposals for the Same Site Can Differ
Oct 18, 2026

Why Two Topographic Survey Proposals for the Same Site Can Differ

Two topo proposals can differ in surveyed limits, features, control, utility work, and deliverables. Compare their scope before comparing price.

Read more →
What to Send for a Utility Easement Description and Map Exhibit in Washington
Oct 17, 2026

What to Send for a Utility Easement Description and Map Exhibit in Washington

For a new Washington utility easement, send the proposed corridor, parcel and title records, utility plans, and recording requirements before drafting

Read more →
← NewerPage 3 of 5Older →