Land Surveying and Engineering Insights

Who Can Certify a FEMA Elevation Certificate for a Washington Home?
FEMA allows an authorized surveyor, engineer, or architect to certify elevation data. Check Washington credentials and the requester's requirements be
Read more →
What Must Be Resolved Before a Bellevue Short Plat Is Recorded?
Before a Bellevue final short plat is recorded, check approval conditions, the current title report, improvements, survey map, and recording package.
Read more →
When a Washington Site Changes After the Topographic Survey
Site work changed after the topo survey? Identify the affected area, changed elevations and features, and the survey update needed before civil design
Read more →
What to Provide When Requesting a FEMA Elevation Certificate in Washington
Requesting a FEMA Elevation Certificate for a Washington home? Provide the address, purpose, permit or insurer request, building details, and access.
Read more →
When Is a FEMA Elevation Certificate Needed for a Washington Home Project?
A FEMA Elevation Certificate may support a Washington home project’s floodplain permit or insurance review. Learn who determines the need and what it
Read more →
What to Prepare for a Boundary Line Adjustment Survey in Bellevue
Preparing a Bellevue boundary line adjustment? Gather title records, prior surveys, the proposed line, site details, and current city requirements.
Read more →
Land Surveying for Puget Sound Redevelopment Sites: How Existing Improvements Change the Scope
Learn how existing buildings, pavement, utilities, drainage, access, and neighboring conditions shape survey scope for Puget Sound redevelopment sites
Read more →
What Survey Information Telecom Teams Need Before Finalizing a Right-of-Way Route
Telecom route planning may require boundary, easement, right-of-way, topographic, utility, and control information. Learn how to define the survey sco
Read more →
When Seattle Project Teams Should Bring a Land Surveyor Into Predevelopment
Seattle project teams should involve a land surveyor when property lines, topography, access, trees, utilities, or right-of-way conditions could shape
Read more →